CCalcPro
← Back to all calculators

Earthwork

Cut/fill volumes with swell, shrinkage, and truck-load estimates.

Volume method

Adjustments

Results

Bank volume148.15cy
Bank volume4,000cf
Loose (after swell)185.19cy
Compacted (after shrink)125.93cy
Truck loads (loose)13.2loads

Notes

  • Bank volume is the in-place, undisturbed volume.
  • Loose volume is what you haul. Compacted volume is what fits in the embankment after compaction.
  • Average end-area method: V = L × (A₁ + A₂) / 2.